断桥铝门窗施工方案 这些常识你必须要懂得!
导读
Introduction
门窗大企整理的断桥铝门窗介绍及施工方案,这些常识也许对您有用!
Doors and windows of large and large enterprises to collate the broken bridge aluminum doors and windows introduction and construction program, these common sense may be useful to you!
一、断桥铝介绍
First, the broken bridge aluminum introduction
断桥铝是指隔断冷热桥,铝合金是金属,导热比较快,所以室内外温度相差很多时,铝合金就成了为热量传递的“桥”了,断桥就是将铝合金从中间断开,采用硬塑与两边的铝合金相连,而塑料导热慢,这样热量就不容易传递了,所以叫断桥铝合金。
The aluminum partition refers to cold bridges, Aluminum Alloy metal, heat faster, so the indoor and outdoor temperature difference, Aluminum Alloy became for the heat transfer of "bridge", the bridge is Aluminum Alloy disconnected from the middle of the hard plastic is connected with the Aluminum Alloy on both sides, and the plastic heat slowly. So the heat is not easy to transfer, so it is called the Aluminum Alloy.
断桥铝采用隔热铝型材和中空玻璃,仿欧式结构,外形美观,具有节能、隔音、防噪、防尘、防水功能。这类门窗的热传导系数K值为3W/m2·K以下,比普通门窗热量散失减少一半,降低取暖费用30%左右,隔声量达30分贝以上,水密性、气密性良好,均达国家A1类窗标准。
The broken bridge aluminum adopts heat insulation aluminum profile and hollow glass, imitating European style structure, beautiful appearance, with energy saving, sound insulation, noise prevention, dustproof, waterproof function. The heat conduction coefficient K of this kind of doors and windows is 3W/m2. K, which reduces the heat loss of ordinary doors and windows by half, reduces heating costs by about 30%, and the sound insulation quantity is above 30 decibels. The water tightness and air tightness are good, and all of them reach the national A1 class window standard.
二、 施工方法及要点
Two, construction methods and key points
2.1  工艺流程:弹线找规矩―→门窗洞口处理―→安装连结件检查―→门窗处理检查―→安装―→四周嵌缝―→五金配件―→清理。
2.1 process: the bomb line to find the rules to install windows and doors processing links, check check to install windows and doors, hardware accessories, caulking around to clean up.
2.2门窗框成品堆放、保管、吊装。进入现场安装前,工程负责人必须对门窗安装队全体人员进行施工交底,并有书面交底材料存档,同时提供安装基准线。
2.2 door and window frame product stacking, storage, hoisting. Before entering the scene, the engineering leader must conduct the construction contact for all the staff of the windows and doors installation team, and have written materials, and provide the installation baseline.
2.3  膨胀螺丝   直接从门窗框内侧打入墙体内,膨胀螺丝的长度不低于80mm,每相邻的膨胀螺丝间距不大于500mm。
2.3 the expansion screw directly into the wall from the inside of the door and window frame, the length of expansion screw is not less than 80mm, the spacing of each adjacent expansion screw is not greater than 500mm.
2.4  门窗框与墙体之间的接缝处理方法:用发泡剂填充框与墙体间间隙,发泡剂溢出来的部分,用铲刀铲平,然后抹水泥将其盖住,等水泥干燥后,再均匀地在接口处打密封胶。
Treatment method of joint between the 2.4 door and window frame and wall filled frame and the wall of the gap between the foaming agent, foaming agent spilled out, with the shovel shovel, and then wipe the cement cover, such as cement after drying, and then evenly sealant in the interface.
三、玻璃安装的技术方法:
Three. Technical methods of glass installation:
3.1  安装玻璃前,将裁口内的污垢清除干净,并沿裁口的全长均匀抹1~3mm厚的底油灰。
3.1 before installing glass, dirt cutting mouth clean, and is cut along the mouth evenly with 1~3mm thick bottom putty.
3.2  安装长边大于1.5m或短边大于1m的玻璃,用橡胶垫并用压条和螺钉镶嵌固定。
3.2 install a glass with a long edge greater than 1.5m or a short edge greater than 1m, and fix it with a rubber pad with a layer and screw.
3.3  安装于竖框中的玻璃,应搁置在两块相同的定位垫块上,搁置点离玻璃垂直边缘的距离宜为玻璃宽度的1/4,且不宜小于150mm。
3.3 installed on the mullion of the glass, we should lay aside in the two block of the same location of the pad, aside from the edge of the glass vertical distance appropriate for the width of glass 1/4, and should not be less than 150mm.
3.4  安装于扇中的玻璃,应按开启方向确定其定位垫块的位置。定位垫块的宽度应大于所支撑的玻璃件的厚度,长度不宜小于25mm,并应符合设计要求。
3.4 the glass installed in the fan should determine the position of the positioning pad according to the opening direction. The width of the positioning cushion block should be greater than the thickness of the supporting glass piece, the length should not be less than 25mm, and should meet the design requirements.
3.5  玻璃安装就位后,其边缘不得和框、扇及其连接件相接触,所留间隙应为2~3mm。
When the 3.5 glass is installed in place, its edge shall not contact with the frame, fan and its connectors, and the clearance should be 2~3mm.
3.6  玻璃安装时所使用的各种材料均不得影响泄水系统的通畅。
3.6 all the materials used in the installation of glass shall not affect the patency of the drainage system.
3.7  玻璃镶入框、扇内,填塞填充材料、镶压线条时,应使玻璃周边受力均匀。
3.7 glass insert into the frame, inside the fan, filling filling material, press the line, the glass should be around the force evenly.
四、施工管理
Four, construction management
4.1   门窗工程计划工期为----------天,门窗工程质量达到合格。
4.1 doors and windows project duration is - day, windows and doors project quality to achieve the qualified.
4.2    按本项目确定的工期与质量承诺的要求,在门窗工程施工中,合理配置生产诸要素,确保施工进度,确保基础工程的施工质量,实现合同目标。
4.2 according to the requirements of the construction period and quality commitment determined by the project, in the construction of doors and windows, the reasonable allocation of production elements, ensure the construction schedule, ensure the construction quality of the foundation project, and achieve the contract goal.
4.3    施工时要合理安排好各工种之间的相互关系、施工顺序,确保有序施工。并合理调配、安排好劳动力,满足施工进度需求。
4.3, the construction should be reasonable arrangements of the relationship between the various types of work, construction order, to ensure orderly construction. And reasonably allocate and arrange the labor force to meet the construction schedule requirements.
4.4    根据施工进度及时采购建筑材料,并按规范要求做好进场检验工作。
4.4 timely procurement of building materials according to the progress of construction, and according to the requirements of the specification to do good inspection work.
4.5   在门窗的施工中,严格按相关规范要求施工,确保外墙保温工程的施工质量。
4.5 in the construction of doors and windows, strictly according to the requirements of the relevant specifications to ensure the construction quality of the external wall insulation engineering.
4.6    加强施工过程中的监督指导工作,对门窗施工实行全过程有效控制。
4.6 strengthen the supervision and guidance during the construction process, and effectively control the whole process of the doors and windows construction.
4.7    各工种在施工中要做好班组自检工作及工序报验工作,保证每道工序的施工质量。
4.7 of each type of work in the construction team to do the self inspection and process inspection work, ensure the construction quality of each process.
4.8    按规范要求及时做好质量保证资料的收集、记录、整理工作,确保资料真实、齐全、规范标准且与施工进度同步。
4.8, timely collect, record and arrange quality assurance data according to the specifications, ensure that the data is real, complete, standardized and synchronized with the construction schedule.
五、安全与文明施工
Five, safety and civilized construction
5.1   门窗工程安全与文明施工目标为:轻伤以上安全事故为零,施工现场整洁文明。
5.1 windows and doors project safety and civilized construction target is: slight injury above safety accident is zero, construction site clean and civilized.
5.2   施工前所有机械设备要进行检验、调试合格并报验后,放可开始使用。使用过程中实行专人负责制,并设专人进行日常的维修及保养工作。
5.2 before the construction of all mechanical equipment should be tested and qualified inspection and debugging, can be started. In the process of using special person responsibility system, and set up special personnel for routine maintenance and repair work.
5.3   施工时对施工人员要进行安全教育并讲清安全注意事项。施工中必须严格遵守各项安全规章制度、操作规程,确保安全施工。
5.3 construction of the construction personnel to carry out safety education and clarify the safety precautions. Construction must strictly comply with the safety rules and regulations, operating procedures, to ensure safe construction.
5.4   施工材料按要求做到有序堆放,现场保持文明整洁。
5.4 construction materials according to the requirements of orderly stacking, keep civilized and tidy.
5.5   玻璃工程安装时注意玻璃的污染,安装后应进行清理,以保证玻璃的清洁,竣工后的玻璃工程,表面应洁净,不得留有油灰、浆水、油漆等斑污。
5.5 glass installation note glass pollution should be installed after the clean-up, to ensure the completion of the clean glass, glass engineering, surface should be clean, and shall not leave water, putty, paint stains.